Tag : Ingolf

Weekly Traffic Advisories

first_img Local Area Office: 902-825-4827 Fax: 902-825-3593 CUMBERLAND COUNTY: Highway 104 Highway 104 will be reduced to one lane for patching, crack filling and micro-surfacing west of Exit 5 for about 6.5 kilometres until Monday, Aug. 31. Work takes place from 7 a.m. to 8:30 p.m. Local Area Office: 902-825-3395 Fax: 902-825-2776 Local Area Office: 902-883-9789 Fax: 902-883-8732 Local Area Office: 902-893-5797 Fax: 902-896-2259 Local Area Office: 902-527-5448 Fax: 902-527-5371 Local Area Office: 902-752-6224 Fax: 902-755-7184 PICTOU COUNTY: Granton-Abercrombie Road Granton-Abercrombie Road, from Trunk 4 north for about 4.2 kilometres to the railway crossing near the Michelin Plant, will be reduced to one lane for repaving until Wednesday, Sept. 30. Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 8:30 p.m. INVERNESS COUNTY: Trunk 19 Sections of Trunk 19, from 40 metres north of Blackstone Road south for about three kilometres, will be reduced to one lane for repaving until Monday, Aug. 31. Traffic control people and pilot vehicle will be on site. Work takes place from 5:30 a.m. to 9 p.m. INVERNESS COUNTY: Murrays Hill Bridge Murrays Hill Bridge, which crosses the Mabou River near Rankinville Road, is closed until further notice. Local Area Office: 902-533-2771 Fax: 902-533-4352 Local Area Office: 902-625-4200 Fax: 902-625-1946 Local Area Office: 902-752-6224 Fax: 902-755-7184 Local Area Office: 902-538-3877 Fax: 902-538-8288 ANNAPOLIS COUNTY: Shore Road Sections of Shore Road from the intersection of Parker Mountain Road to the intersection of Hampton Mountain Road will be reduced to one lane for road improvements. The work is scheduled to be completed on Saturday, Aug. 15. Work takes place from 6 a.m. to 9 p.m. Traffic control people will guide motorists through the construction zone. RICHMOND COUNTY: Trunk 4 Trunk 4 from Lynches River Connector east to Chapel Island will be reduced to one lane for road repairs and paving from Monday, Aug. 10 until Saturday, Oct. 31. Work takes place from 7 a.m. to 7 p.m. CAPE BRETON REGIONAL MUNICIPALITY: Trunk 4 Trunk 4 near Ben Eoin will be reduced to one lane for gravelling, grading and paving until Monday, Aug. 31. Work takes place from 7 a.m. to 7 p.m. A pilot vehicle will guide drivers through the construction zone. RICHMOND COUNTY: Trunk 4 Trunk 4, from South Side River Bourgeois Road for about 7.8 kilometres east to Highway 104, will be reduced to one lane for crack filling and sealing until Monday, Aug. 31. Traffic control people on site. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-755-5142 Fax: 902-755-7184 Local Area Office: 902-680-5914 Fax: 902-681-7151 Local Area Office: 902-742-2415 Fax: 902-742-0649 CAPE BRETON REGIONAL MUNICIPALITY: Keltic Drive Keltic Drive from the railway tracks west for five kilometres will be reduced to one lane for repaving until Wednesday, Sept. 30. Traffic control people and a pilot vehicle will be on site. A detour is available on Highway 125. Work takes place from 6 a.m. to 8 p.m. Local Area Office: 902-883-9789 Fax: 902-883-8732 Local Area Office: 902-625-4388 Fax: 902-625-4393 HALIFAX REGIONAL MUNICIPALITY: Highway 107 Sections of Highway 107, from 318 overpass for about 11 kilometres to Akerley Boulevard (including ramps) will be reduced to one lane for paving until Wednesday, Sept. 30. Traffic control people are on site. Work takes place from sunrise to sunset. There will be no work from 6 a.m. to 9 a.m. westbound, and from 3:30 p.m. to 6 p.m. eastbound. Local Area Office: 902-563-2518 Fax: 902-563-2517 HALIFAX REGIONAL MUNICIPALITY: Highway 101 Highway 101 from Beaver Bank interchange west for about three kilometres, is reduced to one lane in both directions for repaving and guardrail repairs until Wednesday, Sept. 30. Traffic control people are on site. Work takes place from sunrise to sunset. LUNENBURG COUNTY: LaHave Island Bridge Traffic on the LaHave Island Bridge on Crescent Beach Road will be delayed during repairs from Monday, Aug. 10 until Friday, Sept. 11. The bridge will remain open to traffic but delays of up to 20 minutes should be expected. Work takes place on week days from 8 a.m. to 7 p.m. Local Area Office: 902-295-2700 Fax: 902-295-2617 Local Area Office: 902-565-6841 Fax: 902-563-2517 Local Area Office: 902-674-2535 Fax: 902-674-2170 ANNAPOLIS COUNTY: Highway 101 Sections of Highway 101 for about 11.5 kilometres west of Exit 22 will be reduced to one lane for guardrail replacement, patching and paving until Wednesday, Sept. 30. Work takes place from 7 a.m. to 4:30 p.m. each day. Local Area Office: 902-893-1573 Fax: 902-896-2259 Local Area Office: 902-794-5120 Fax: 902-794-5141 INVERNESS COUNTY: Trunk 19 Sections of Trunk 19, from Route 395 south for about 9.2 kilometres will be reduced to one lane for repaving until Monday, August 31. Traffic control people and a pilot vehicle will be on site. Work takes place from 5:30 a.m. to 9 p.m. Local Area Office: 902-863-0364 Fax: 902-863-7482 Local Area Office: 902-827-5388 Fax: 902-827-5190 Local Area Office: 902-893-5785 Fax: 902-896-2259 CAPE BRETON REGIONAL MUNICIPALITY: Scotch Lake Road Scotch Lake Road from Route 223, east for 7.5 kilometres will be reduced to one lane for repaving until Wednesday, Sept. 30. Traffic control people and a pilot vehicle are on site. A detour is available on Route 223. Work takes place from 6 a.m. to 8 p.m. Local Area Office: 902-890-1573 Fax: 902-896-2259 CAPE BRETON REGIONAL MUNICIPALITY: Trunk 4 Trunk 4, from Greenhill Drive to about 800 metres past Meadows Road, will be reduced to one lane for paving until Monday, Aug. 31. Motorists are advised of delays and to use an alternate route if possible. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-896-7058 Fax: 902-896-2259 GUYSBOROUGH COUNTY: Melford Brook Bridge The Melford Brook Bridge on Route 344 at Middle Melford is closed. A two-lane detour bridge will be available until a permanent bridge is completed. The speed limit has been reduced to 60 km/h at the site and advance warning signs are in place. Reduced weight restrictions are no longer in effect at this crossing. INVERNESS COUNTY: Doyle’s Bridge Doyle’s Bridge on the East Margaree Road will be closed until further notice. A detour is available on East Margaree Crossroad. KINGS COUNTY: Glebe Bridge Glebe Bridge on Route 201 will have a 2.7 metre height restriction and a 15-tonne weight restriction until further notice. KINGS COUNTY: Cogswell Bridge Cogswell Bridge on Green Road will be closed for maintenance and general repairs from Monday, Aug. 10 until Friday, Aug. 14. Traffic should detour on Brooklyn Street to Steadman Road then to Lakewood Road. YARMOUTH COUNTY: Route 335/Dennis Point Wharf Road Route 335 in West Pubnico, from the intersection of Rock Road south for about 3.7 kilometres and Dennis Point Wharf Road, will be reduced to one lane for ditching and repaving until Friday, Aug. 21. Traffic delays are expected. Cyclists are asked to use caution as pavement is grooved. Local Area Office: 902-533-2771 Fax: 902-533-4352 Local Area Office: 902-893-1573 Fax: 902-896-2259 Local Area Office: 902-680-5914 Fax: 902-681-7151 Local Area Office: 902-527-5448 Fax: 902-527-5371 Local Area Office: 902-563-2518 Fax: 902-563-2517 PICTOU COUNTY: Highway 104, Night Work Construction of the Pine Tree Road overpass on Highway 104 will continue through the night until Friday, Aug. 14. Periodic, short delays are expected on Highway 104 because of trucks crossing Highway 104. Traffic control people will be on site. Local Area Office: 902-424-6144 Fax: 902-424-7116 HALIFAX REGIONAL MUNICIPALITY: Route 212 Sections of Route 212 from Pratt and Whitney Drive east for about 7.7 kilometres will be reduced to a one lane until Monday, Aug. 31. Traffic control people are on site. Work takes place from sunrise to sunset. Local Area Office: 902-794-5120 Fax: 902-794-5141 GUYSBOROUGH COUNTY: Spanks Bridge Spanks Bridge on the Larry’s River Road at West Cooks Cove will be out of service (except to local traffic) for repairs until Saturday, Oct. 31. A detour is available on Mountain Road and Trunk 16. Trans-Canada Trail users are advised that the Spanks Bridge is closed and to use caution when travelling in this area. Local Area Office: 902-625-4200 Fax: 902-625-1946 HANTS COUNTY: Route 215 Route 215 from Hiltz Road to William Conley Road between Pembroke and Walton will have traffic interruptions for repaving until Monday, Aug. 31. Traffic control people are on site. Work takes place from dawn to dusk. Local Area Office: 902-798-6889 Fax: 902-798-2927 RICHMOND COUNTY: Bona Road Bona Road, from Rocky Bay Road to Cap La Ronde Road in the Town of D’Escousse will be reduced to one lane for clearing, and repaving until Wednesday, Sept. 30. Traffic control people are on site. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-825-7311 Fax: 902-825-3593 LUNENBURG COUNTY: Trunk 3, Gold River Bridge A one-lane bridge is open on Trunk 3 between Mahone Bay and Chester while the new Gold River Bridge is being built. Work is expected to continue until Monday, Aug. 10. Traffic lights are in place. Local Area Office: 902-798-6885 Fax: 902-798-6747 HANTS COUNTY: Route 236 Route 236 from Route 354 in Kennetcook for about 6.4 kilometres, to Bishop Road will be reduced to one lane for repaving until Monday, Aug. 31. Traffic control people are on site. Work takes place from dawn to dark. Local Area Office: 902-798-5957 Fax: 902-798-6747 HANTS COUNTY: Highway 101 On Saturday, Aug. 8, there will be a 20 minute closure of Highway 101 at 6 a.m. between Exit 4 and Exit 5, near St. Croix, to allow for blasting needed for road construction. Please obey traffic control people in the area. Drivers should expect delays or use alternate routes. Local Area Office: 902-835-2702 Fax: 902-835-1860 KINGS COUNTY: Hantsport Kates Bridge on Tannery Road in Hantsport is closed for repairs until further notice. A detour is available on Avon Street. COLCHESTER COUNTY: Trunk 2 Trunk 2 will be reduced to one lane for paving from Cumberland County line to Soley Cove Road until Wednesday, Sept. 30. Traffic control people and pilot vehicle on site. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-625-4200 Fax: 902-625-1946 Local Area Office: 902-543-4671 Fax: 902-543-5596 RICHMOND COUNTY: D’Escousse Cap La Ronde Road in the Town of D’Escousse, from the intersection of Route 320 and Poirierville west for about 5.3 kilometres, will be reduced to one lane for clearing, and repaving until Wednesday, Sept. 30. Traffic control people are on site. Work takes place from 7 a.m. to 7 p.m. RICHMOND COUNTY: Whiteside Road The Whiteside Road will be reduced to one lane from the intersection of Route 320 for 900 metres to the Richmond Academy to allow for paving until Monday, Aug. 31. Traffic control people will be on site. PICTOU COUNTY: Mount William Road Mount William Road, from Highway 104 about 5.3 kilometres to Granton-Abercrombie Road, will be reduced to one lane for repaving until Wednesday, Sept. 30. Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 8:30 p.m. INVERNESS COUNTY: Broad Cove Marsh Road Section 3 of Broad Cove Marsh Road from Trunk 19 north for about one kilometre will be reduced to one lane for repaving until Monday, Aug. 31. Traffic control people and a pilot vehicle on site. Work takes place from 5:30 a.m. to 9 p.m. Local Area Office: 902-679-4308 Fax: 902-679-6124 RICHMOND COUNTY: Trunk 4 Trunk 4 from Lakeshore Drive east for 4.7 kilometres will be reduced to one lane for road repairs and paving from Monday, Aug. 10 until Saturday, Oct. 31. Work takes place from 7 a.m. to 7 p.m. KINGS COUNTY: Bridge Closure The Busby McMahon Bridge on Brooklyn Street, near Aylesford, will be closed until further notice. A marked detour route is available on New Road, Route 221 and Morden Road. Local Area Office: 902-625-4200 Fax: 902-625-1946 VICTORIA COUNTY: Big Baddeck Road Sections of Big Baddeck Road, north of Old Margaree Road, will be reduced to one lane until Monday, Aug. 31 for repaving. A detour route is available on Old Margaree Road loop. Work takes place from 6 a.m. to 8 p.m. Local Area Office: 902-674-2535 Fax: 902-674-2170 COLCHESTER COUNTY: Stewart’s Bridge Stewart’s Bridge located between Route 311 and West North River Road will be closed for replacement from Monday, Aug. 10 until Monday, Nov. 30. A temporary panel bridge will be in place as a detour. CAPE BRETON REGIONAL MUNICIPALITY: Trunk 22 Trunk 22, on Louisbourg Highway south of Hornes Road will be reduced to one lane for about six kilometres for clearing, gravelling and paving until Wednesday, Sept. 30. Work takes place from 7 a.m. to 5 p.m. KINGS COUNTY: Hillaton Road Hillaton Road will be closed for bridge repairs until further notice. A detour route is available from Route 221 to Route 358 to Saxon Street. GUYSBOROUGH COUNTY: South River Lake Road Sections of South River Lake Road, from 2.9 kilometres west of the North Ogden Road east for 6.4 kilometres, will be reduced to one lane for gravelling and repaving until Monday, August 31. Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 7 p.m. Local Area Office: 902-533-2771 Fax: 902-533-4352 Local Area Office: 902-625-4200 Fax: 902-625-1946 COLCHESTER COUNTY: Trunk 2 Sections of Trunk 2 from Taggart Loop for about 8.5 kilometres to Portapique will be reduced to one lane for crack filling and seal coating until Monday, Aug. 31. Traffic control people are on site. Work takes place from 7 a.m. to 8:30 p.m. COLCHESTER COUNTY: Highway 102 Highway 102 will be reduced to one lane for patching, crack filling and micro-surfacing from Short’s Lake, south for about six kilometres until Monday, Aug. 31. Work takes place from 7 a.m. to 8:30 p.m. Local Area Office: 902-625-4200 Fax: 902-625-1946 Local Area Office: 902-625-4200 Fax: 902-625-1946 Local Area Office: 902-755-7152 Fax: 902-755-7184 VICTORIA COUNTY: Highway 105 Two sections of Highway 105, from Exit 10 west for 4.3 kilometres, and east of Big Harbour Road for about 1.8 kilometres, will be reduced to one lane for repaving until Monday, Aug. 31. Motorists can expect delays. Work takes place from 6 a.m. to 8 p.m. Local Area Office: 902-542-6344 Fax: 902-542-6342 ANNAPOLIS COUNTY: Paradise Lane Paradise Lane in the community of Paradise will be closed from Monday, Aug. 10 until Friday, Aug. 14 to replace a culvert. Detour routes will be marked on Lawrencetown Lane and South Street. Local Area Office: 902-424-0054 Fax: 902-424-7116 Local Area Office: 902-742-0587 Fax: 902-742-6000 Local Area Office: 902-625-4200 Fax: 902-625-1946 KINGS COUNTY: Trunk 1 Sections of Trunk 1 from Oak Island Road (Avonport Roundabout), for about 8.1 kilometres to Hantsport town line, will be reduced to one lane for paving until Monday, Aug. 31. Traffic control people are on site. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-538-3877 Fax: 902-538-8288 Local Area Office: 902-625-4200 Fax: 902-625-1946 HANTS COUNTY: Route 215 Whale Creek bridge on Route 215 about 300 metres west of William Conley Road will be reduced to one lane for replacement of a cross culvert on the panel bridge until Wednesday, Sept. 30. Work from dawn to dusk. PICTOU COUNTY: Young Road Highway 104 access on Young Road in Pine Tree will be closed until further notice for the Highway 104 twinning project. The road remains open to local residents but has no exit. Local Area Office: 902-674-2535 Fax: 902-674-2170 Local Area Office: 902-625-4200 Fax: 902-625-1946 YARMOUTH COUNTY: Trunk 1 Trunk 1, from Prospect Street for about 5.2 kilometres to Lakeside Road, will be reduced to one lane for repaving and shoulder repairs until Thursday, Aug. 20. Traffic delays are expected. Cyclists are asked to use caution as pavement is grooved. Work takes place from dawn to dusk. COLCHESTER COUNTY: Route 236 Sections of Route 236 from the Hants County line for about eight kilometres to Princeport Road will be reduced to one lane for paving and shoulder repairs until Monday, Aug. 31. Traffic control people and signs are on site. Work takes place from 6 a.m. to 7 p.m. HANTS COUNTY: Sangsters Bridge Sangsters Bridge, on Sangsters Bridge Road connecting Upper Falmouth and Trunk 14, will be closed for repairs until Wednesday, Sept. 30. A detour route is available through the Town of Windsor. HALIFAX REGIONAL MUNICIPALITY: Route 336, Upper Musquodoboit Sections of Route 336, from the intersection with Route 224 for about 9.7 kilometres to the Colchester County line, will be reduced to one lane for repaving and drainage improvements until Monday, Aug. 31. Traffic control people are on site. Work takes place from 6 a.m. to 9 p.m. VICTORIA COUNTY;: Buchanan Bridge Buchanan Bridge on Highway 105 at South Haven will be reduced to one lane for deck replacement until Monday, Aug. 31. There will be 24-hour traffic control at the construction zone. Work takes place from 6 a.m. to 8 p.m. INVERNESS COUNTY: Cabot Trail Sections of the Cabot Trail (Trunk 30) from Point de Havre Road north for about 8.3 kilometres to Cape Breton Highlands National Park, will be reduced to one lane for crack filling and sealing until Monday, Aug. 31. Traffic control will be on site. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-742-0587 Fax: 902-742-6000 ANTIGONISH COUNTY: Route 245 Route 245 will have alternating lane closures for about 7.8 kilometres west of the Antigonish town line for ditching, culvert installation and repaving until Saturday, Sept. 12. Detour on Old Maryvale Road. Work takes place from 7 a.m. to 7 p.m. RICHMOND COUNTY: Route 206 Route 206 from Creighton Road east to Veteran’s Memorial Drive will be reduced to one lane for road repairs and paving from Monday, Aug. 10 until Saturday, Oct. 31. Work takes place from 7 a.m. to 7 p.m. Local Area Office: 902-625-4200 Fax: 902-625-1946 KINGS COUNTY: Rainsforth Bridge Rainsforth Bridge on Rainsforth Road will be closed for repairs until further notice. A detour is in place. Work takes place from sunrise to sunset. NEW WORK YARMOUTH COUNTY: Grey Bridge Grey Bridge on Grey Road, East Kemptville is closed for structural repairs. CONTINUING WORK -30-last_img read more